Mayfield 7 Bulk Liquid Berth Project

End User: Stolthaven

Marine12/2015 - 05/ 2016

Newcastle in New South Wales Australia

Mayfield 7 is a bulk liquid terminal operated by Stolthaven Australia at Mayfield, Newcastle and the project are developing a new wharf to accommodate vessels up to 100,000 tonnes (DWT). The scope of marine construction works involves the installation of the piled wharf structure, dredging, and scour and batter slope protection works.

Project Challenges

1. High level quality requirement, full quality supervision by client inspectors. 2. Highest thicknesss(25.4mm) without negative tolerance for spiral welded pile @ API 5L X65 PSL1. 3. C9 Clutch Welding. 4. Welding and Inspection in accordance with Australia Standard: AS/NZS 1554.1, AS 2980, AS 2207, AS 1171. 5. Short Delivery Time

Our Solutions

CNOOD's scope of services included procurement, and fabrication of spiral welded pile, longitudinal welded pile shoe, and C9 clutch welding onto piles. CNOOD project team provide full technical support for fabrciation and inspeciton to fully compliance with Australia Standard.

Conclusion

1. CNOOD 1st Marine Project in Australia Market. 2. Highest Quality Requirement for Spiral Welded Piles.