Our Solutions
1. This product is the product with the largest volume that has been processed at present, so a relevant process system should be established according to this feature.
2. The production schedule was reduced to less than 3 months through the effective management of this project.
3. Conducted a lot of research on the technical conditions of raw materials, adjusted the performance by adding relevant elements, and carried out experiments on the material performance in the laboratory.
4. CNOOD had arranged on-site personnel and inspectors to conduct the whole process of testing and project management tracking since the beginning of the project.
5. Quickly find out the risk for affecting the delaying during the implementation phase, adjust the relationship between various production departments, improve and solve the problem of capacity limitation of the production line.