THE FIRST PHASE OF KINGSTON CONTAINER TERMINAL EXPANSION PROJECT (KCT – PHASE 1)

End User: KINGSTOM FREEPORT TERMINAL LTD

Marine09/2016 - 06/2017

Jamaica

Kingston Freeport Terminal Limited (KFTL) owned by CMA CGM got awarded in April 2015 the 30 years concession for the Kingston Container Terminal (KCT). This Container terminal, with current capacity of 2.8 MTEU, is conveniently situated on a direct line between the U.S. and the Panama Canal, and between Europe and the Panama Canal, would ensure a leadership position for the Port as a regional transhipment hub. Phase 1 aims at accommodating the existing terminal (Quays and nautical access) to the Neopanamax container vessels, through deepening and realignment of the nautical accesses and refurbishment of 1 200 lm of existing quays. This will allow access as from end 2017 of Neopanamax vessels with 14.7 m draft.

Project Challenges

Multiple products purchasing channel and complexity project management. ERW pipe produced by BAOSTEEL, HRC produced by Ansteel, HP 12X74 produced by Masteel, the secondy assembly fit-up and welding work finished by CNOOD fabrication center.

Our Solutions

1. Quick response 2. Fluent Communication line 3. Good Team work

Conclusion

Delivery of material in full lengths Delivery as per specifications Small diameter ERW pipe with long length and weld L-T clutches Customer Satisfaction